Construction

Loads change.Power staysin control.

LONGi Construction Microgrid Solutions

Manage peak loads, limited grid connections and long low-load periods. Keep power in step with the worksite.

Plan your site power

Cranes · Hoists · Pumps · Site compounds

A DAY ON SITE

One workday. Three different power demands.

08:00

Morning start-up · Peak demand

Crane lifts and hoist starts create sharp increases in demand.

14:00

Intermittent work · Low-load fuel use

Equipment cycles on and off while generators may keep running inefficiently.

22:00

After work · Noise pressure

Lighting and site compounds still need power when noise matters most.

Site load profile
Short power peaksExtended low loads

Design power around the constraints of your site.

Equipment demand peaks. The connection has a limit.

Single-source supply
Site load profileSource capacity limit
Source + storage
Site load profileStorage peak support

Let the source carry the base load and storage support the peaks.

Plan supply around equipment cycles, connection capacity and battery state.

AFTER THE LAST LIFT

After the last lift,the site still needs power.

During low-load periods, use storage according to the operating strategy to reduce continuous generator operation.

  • Lighting & security
  • Offices & communications
  • Welfare facilities

Start planning site power with your equipment list.

  1. OnePilot configuration
  2. OneNexus site power
  3. OneView monitoring